System 7 · Now recruiting UK installers

Months of building. Done in days.

Superstrux™ System 7 is the precision-engineered steel shell for house extensions — erected in 24 hours, finished in around 7 days, and up to 40% cheaper than a traditional build.

40%Cost savings
Faster build
24hrsTo erect shell
100%Recyclable
Scroll to build
Why System 7

Traditional extensions lose weeks to weather, wet trades and waiting. System 7 deletes all three.

Superstrux™ System 7 is a next-generation method for building house extensions and garden rooms. Every frame is fabricated to millimetre accuracy from your architect's drawings, delivered as pre-built steel cassettes, and erected on site in as little as 24 hours.

No mortar curing. No scaffold marathons. No weather delays. Just a precision shell that's watertight in a day and finished — brick, render, timber or cladding — in about a week.

For your business that means faster handovers, predictable margins and more jobs through the book every year. Install it for your existing customers or grow with it — registered installers unlock trade pricing and instant quoting tools.

40% Lower build cost vs traditional
24hrs To a watertight shell
~7days To a finished extension
Inside the shell

Engineered like a product.
Built like a house.

System 7 replaces wet, weather-dependent masonry with a factory-precise steel structure — without ever looking modular once finished.

SYS.7 — Wall build-up Exploded diagram of the Superstrux wall system: steel frame, insulation, OSB, membranes and brick finish
01

Precision steel frame

High-strength, millimetre-accurate and lightweight. Spans wide openings for bi-folds and sliders without bulky supports — and often avoids costly foundation upgrades.

02

High-performance insulation

Designed to exceed Building Regulations with airtight construction and excellent thermal performance. Lower heating bills, year-round comfort.

03

Weatherproof membranes

Air and vapour barriers plus breather membrane seal the shell — watertight in 24 hours, whatever the UK weather is doing.

04

Any finish you like

Brick slips, render, timber or cladding. Flat or pitched roofs. The finished extension matches the house — it never looks modular.

The 7-day build

One week.
Start to handover.

While a traditional build is still waiting on brick deliveries, a System 7 crew has already handed the keys back.

DAY 0 Superstrux System 7 components delivered flat-packed on a pallet

Delivered flat-packed

The engineered shell arrives on site, fabricated to your architect's drawings.

DAY 1 Installers erecting the Superstrux steel frame on site

Shell up. Watertight.

Pre-built steel cassettes are bolted together, boarded and wrapped — watertight in as little as 24 hours.

DAYS 2–6 Brick slip cladding being applied to a Superstrux extension

Finishes go on

Glazing, roofing and your chosen finish — brick, render, timber or cladding.

DAY 7 Finished Superstrux extension glowing at dusk with open bi-fold doors

Handover

No drying-out period. Furniture in, kettle on — the space is ready to live in.

Why choose Superstrux™

Every advantage.
Engineered in.

A high-performance extension installed in days, not months — saving money, reducing disruption and delivering precision-built results.

01 / SPEED
24hrs

Shell up in a single day

No weeks of bricklaying. The home stays weather-tight almost immediately — ideal for occupied homes, with minimal disruption to family life. Complete in around 7 days.

#1 reason homeowners choose us
02

Cost certainty

Fixed pricing with fewer unknowns. Reduced labour, less delay risk, no lengthy scaffold hire — no budget creep.

03

Structural strength

The high-strength frame spans wider openings without bulky supports. Perfect for big bi-folds, sliders and open-plan living.

Bright open-plan kitchen and living space inside a finished Superstrux extension Finished System 7 interior
04

Factory precision

Millimetre-accurate fabrication delivers better fit, better finish and faster snag-free completion.

05

All-weather build

No waiting for mortar to cure, less downtime from rain or cold. Built year-round — ideal for the UK climate.

06

Energy performance

Exceeds Building Regulations with excellent insulation, airtight construction and lower heating bills.

07

Lightweight & versatile

Lighter than masonry — often avoids costly foundation upgrades. Suits tight access, rear gardens and urban sites.

08

Sustainable choice

100% recyclable, less site waste and lower embodied carbon than masonry. A Modern Method of Construction.

09

Design flexibility

Brick, render, timber or cladding. Flat or pitched roofs. Matches existing aesthetics — never looks modular.

10

Planning friendly

Fully Building Control compliant with structural calculations included. Mortgage and insurance friendly.

Compare methods

Superstrux™ vs traditional build

Same architect's drawings. Same Building Regs. Wildly different timelines.

Superstrux™ System 7 ~7 days
Traditional build 10–12 weeks
The Superstrux™ way
System 7
  • Time to build 7 days
  • Building Regs approved
  • Architect design
  • Weather delays None
£29,000 inc. VAT — average 6m × 3m
The old way
Traditional build
  • Time to build 10–12 weeks
  • Building Regs approved
  • Architect design
  • Weather delays Strong possibility*
£45,000 inc. VAT — average 6m × 3m

*Most traditional builds are affected by rain and wind, causing major delays. Superstrux™ System 7 can be built year-round with little to no constraints.

For builders & trades

Finish in days.
Fit more jobs into every year.

Faster handovers, fixed pricing and precision components mean happier customers and a fuller order book. Register as a Superstrux™ installer to unlock trade pricing.

Become an Installer
Get certified

Become a Superstrux™ installer

Register now to unlock massive trade savings. Here's how it works:

Apply in two minutes

Tell us who you are, where you work and what you build. No obligation.

Unlock trade pricing

Approved installers get access to trade prices and the quoting tools.

Quote & build

Use the configurator to generate instant quotes with your trade discount.

By submitting this form, you agree to be contacted regarding installer opportunities. We respect your privacy and will never share your information.

Modern Superstrux garden room with anthracite cladding and glass sliding doors at dusk
Also from Superstrux™

Garden rooms.
Same system. Same speed.

The same System 7 shell builds freestanding garden rooms — a garden office, studio or gym, watertight in 24 hours and complete in around 7 days. Fixed prices, instant online quotes.

Explore Garden Rooms
Questions

Everything installers ask us

How much cheaper is Superstrux™ compared to a traditional build?
Superstrux™ System 7 reduces material and labour costs by up to 40% compared to traditional masonry builds. A 6m x 3m extension starts from £29,000 including VAT versus approximately £45,000 for a traditional equivalent.
How long does a Superstrux™ extension take to build?
The Superstrux™ shell is erected in as little as 24 hours and a complete extension is typically finished in around 7 days — compared to 10–16 weeks for a traditional build.
Is Superstrux™ System 7 Building Regulations compliant?
Yes. Superstrux™ System 7 is fully Building Control compliant with structural calculations included. It is also mortgage and insurance friendly.
What finishes are available with Superstrux™?
Superstrux™ extensions can be finished with brick, render, timber, or cladding. Flat and pitched roofs are both available. The finished result does not look modular.